About Mistar Project
MISTAR PROIECT Ploiesti was established in 1997
Business domains:
Office activities:
7111 –Architecture activities
7112 –Engineering and technical consultancy for the above mentioned functions
Activities performed outside the main office and the secondary branches:
7120 –Testing and technical analysis activities
4313 –Drilling works for constructions
Design activities:
Preparation of geotechnical documentation according with NP074/2014:
Preliminary geotechnical studies (SGP), necessary for the preliminary design phase, named Pre-feasibility study (S.PF.));
Geotechnical studies (SG), necessary for the design phases - Feasibility study (SF) and Technical Project (P.Th.), also in the Technical documentation stage for the construction authorization (DTAC);
Detailed geotechnical studies (SG-D) necessary for the Execution details phase (E.D.);
Geotechnical studies for unique phase project (SG-U), necessary in the unique phase (P.T D.E);
Hydrogeological studies;
Hydrological documentation in order to obtain the authorization of water management;
Studies for water management;
Preparation of geotechnical expertise;
Drilling execution for the underground water (piezometers) and oil product pollution monitoring, residues pellicle measurement;
Drilling execution for consolidations
The documentations are prepared for civil and industrial objectives, public or private: constructions for the oil and gas industry, well platforms, access roads, parks, separators, pump stations, compressors stations, gas deethanizer stations, oil treatment stations, industrial and drinking water supply systems, oil deposits, oil products loading and unloading platforms, main oil and gas pipelines, water pipelines, communication infrastructure, transport infrastructure (railways, roads, bridges), gate valves, industrial halls, sports venues, sports fields, schools, administrative offices, office buildings, recreation parks, Aeolian centrals parks, mycro-hydrocentrals on watercourses, apartment buildings and so on.
